
aQRate is dewatering assessment data management software. Crews capture borehole, sample and groundwater data in the field — offline — lab results link to each sample, and reports and visualizations build from the same records.
aQRate is the field data infrastructure behind the assessment — not a replacement for hydrogeological or engineering judgment.
Explore the Dewatering Assessment Demo →Up to 50% less admin time. Based on internal benchmarks. Results vary by workflow.Most dewatering projects run on several disconnected data systems.
Each stage produces information — the connections between them live in someone's inbox.
Drilling crews collect interval depths, USCS descriptions, SPT N-values, recovery, groundwater observations and location information.
Gravel %, sand %, fines % and other particle or index results arrive separately and are manually associated with the field records.
Borehole logs are prepared separately while groundwater monitoring data — pumping well, observation wells, measurements — is collected independently.
Hydrogeological teams transform the collected information into hydrographs, contours, drawdown visualizations and assessment outputs.
It is preserving the connection between the data throughout the workflow — from the borehole interval to the laboratory result to the groundwater measurement that ends up in the assessment.
What a connected dewatering assessment record is worth to the team.
Up to 50% less admin time on data handling: no re-entry between steps, and reports build from the connected record (internal benchmark; results vary by workflow).
Hours spent rebuilding the dataset for each new output go back to billable engineering and interpretation work.
Every observation, sample, measurement and output stays linked, so each chart traces back to a field record.
The same record moves through every stage — no re-entry between steps. Select a step to follow one field observation through the workflow.
Capture borehole and subsurface information directly in the field.
Four record types, one schema. Open a category to see the fields the dewatering assessment template collects.
The interval-level record a driller or field engineer logs at the borehole, structured as it is observed.
Start with a workflow designed around the data a dewatering assessment needs, then adapt it to your project's requirements — borehole and interval records, groundwater monitoring forms, lab analyses, the Dewatering Visualizations view and the Dewatering Technical Assessment report, with 365 sample records to explore.
Project ID*
Date*
Time*
Well ID*
Location*
Pumping Rate (L/min)*
Static GW Level (m bgs)*
Current GW Level (m bgs)*
Sample ID
Lab Analysis Required
Total Suspended Solids
Benzene
PRJ-HIGH-2026
2026-06-23T00:00:00.0000000Z
08:00:00
OW-4
53.56468, -113.43338
0
2.47
3.45904092669934
—
—
—
—
Report ready: Dewatering Technical Assessment
These are five views of one connected project dataset — the borehole logs, the site layout, the monitoring record, and the assessment views draw from the same records, not from re-typed copies. The borehole, groundwater and assessment views show data from the aQRate dewatering demo use case; the site plan is illustrative. Click any view to open it in the aQRate portal.
A representative aQRate demonstration workflow — a demonstration of how a connected data workflow can support a dewatering assessment, not a universal assessment configuration. All figures below are demo data, not project measurements.
2 detailed borehole logs
1 pumping well
4 observation wells
72 hours of groundwater-level monitoring
Physical water samples
Laboratory testing for TSS, Benzene and TPH

↓
↓
If your project involves subsurface investigation, groundwater monitoring, excavation and dewatering decisions, aQRate can provide the connected data layer behind the workflow. Not every organization runs the same workflow — forms and records adapt to how your teams already work.
Real dewatering field conditions: pumping equipment, wellheads and an excavation where the monitoring record is made.From signup to insight in six simple steps — how a team goes from setting up aQRate to collecting, connecting, reviewing and reporting dewatering assessment data.
1
Create your aQRate workspace and start the Dewatering Assessment workflow.
3
Start with the Dewatering Assessment template or adapt the workflow to the project's requirements.
4
Capture borehole, groundwater, sampling, observations, measurements and other project information in the mobile workflow, including offline.
5
Synchronize field records and review the connected project information in the aQRate portal.
6
Turn the structured project records into configured reports and visualizations such as borehole profiles, groundwater trends, spatial views, drawdown views and other project outputs.
In our internal benchmarks, aQRate cut admin time by up to 50%. Results vary by workflow. Dollar savings depend on your boreholes, wells and samples per project, team size and labour rates, and we do not publish a dollar figure. A demo can map your current workflow.
An evaluation of groundwater conditions — typically supporting excavation or construction below the water table — that draws on borehole information, laboratory results and groundwater monitoring to inform pumping, drawdown and discharge decisions. aQRate manages and connects the data behind it; the engineering assessment itself remains the work of qualified professionals.
Borehole and subsurface observations (interval depths, USCS classifications, SPT N-values, recovery), groundwater monitoring (pumping and observation wells, groundwater elevations, timestamps), laboratory information (particle-size results, water-quality analyses), plus locations, project IDs and other project-specific measurements.
Yes. The Dewatering Assessment form captures well ID (PW-1, OW-1 through OW-4), pumping rate, static and current groundwater levels, date, time and location through configurable field forms and workflows — online or offline.
Yes. Sample IDs structured in the field — including lab analysis requirements like TSS, Benzene and TPH — are associated with the laboratory results that come back, so every result stays connected to the sample, interval and borehole it came from.
aQRate can generate configured visualizations from structured project data — including maps, groundwater trends, contours, heatmaps and drawdown visualization through views like Dewatering Visualizations, where implemented for your project.
No. aQRate is designed to manage and connect the field and project data feeding engineering workflows. Specialized modelling software and professional hydrogeological judgment remain part of the appropriate technical workflow.
Yes. Forms, records, relationships, reports and visualizations can be configured around your project's requirements — start from the Dewatering Assessment template and adapt from there.
Stop rebuilding the same project data across spreadsheets, field notes, laboratory records and reports. Connect the workflow from field collection to assessment-ready outputs with aQRate.
Up to 50% less admin time. Based on internal benchmarks. Results vary by workflow.
The template creates a new aQRate workspace with the Dewatering Assessment workflow already configured. aqrate.ca